Articles in this section

Training Day Order and Labels

Your training days need to be completed in order, from left to right (Day 1, then Day 2, and so on). They don't have to fall on the same weekdays each week, so if your schedule moves around, you can train whenever suits you as long as you keep the order. If you follow an asynchronous split, you can follow the steps under "changing weekday labels" below to rename the days. 

Changing the order of your days

You can reorder your days in the Meso Builder before your mesocycle is created:

  1. Tap the three dots in the top right.
  2. Tap Manage days.
  3. Drag the days into the order you want. On mobile, press and hold the left side of a day, then drag it into place. On desktop, drag and drop the day.

Once the mesocycle is created, the order is set.

Changing weekday labels to Day 1, 2, 3

By default, the app labels your training days with weekday names. If your days don't line up with the same weekdays each week, you can label them Day 1, Day 2, Day 3 and so on instead. Set this up while you're creating your mesocycle, where your days are shown at the top:

  1. Tap the dropdown with the day's name.
  2. Select Add a Label.
  3. Repeat for each day in the week.

Your days will still run in the same order. They'll just show as Day 1, 2, 3 instead of weekday names.

 

 

If you have already created the mesocycle and want to change the labels, you can do that by: 

  1. Click the 3 dot menu in the top right corner of the day 
  2. Click 'Relabel'
  3. Select 'Add a day'
  4. Click the box 'Apply to all days in this position' to apply to every week
  5. Click the calendar icon to do this for each day of the week you want to relabel 

 

And if you have one or two anchored days and the rest floating, you can mix/match the labels as needed! 

Was this article helpful?
0 out of 0 found this helpful